Reporte de entrega
Aria Reserve NT Entregas · Unidad 605
Aria Reserve North Tower · Departamento · Pendiente
Estado
Qué va en esta unidad
Damon Darin Daniels · N-C05 | C1
Piso interior
- Flooring material Developer Standard
- Primary Shower Floor Developer Standard
- Primary Shower Side Wall Developer Standard
- Primary Shower Feature Wall Developer Standard
- Secondary Shower Walls Developer Standard
- Includes: Soundproofing, selected flooring, setting materials,installation, grouting, baseboards and flooring protection.
Piso balcón
- Flooring material: Entire balcony Developer Standard
Pintura
- shower floor and side wall to match.
Baños
- Shower glass enclosures All secondary bathrooms Glass doors with hinges and handles
- Mirrors Primary Bathroom With LED lights
- Mirrors All Secondary bathrooms With LED lights
Puertas Frameless
- Primary Bedroom Entrance Frameless door, concealed hinges, Chrome handle 1 Swing Soft White Matte
Fotos
0Todavía no hay fotos. Toma o sube las del recorrido de esta unidad.
Lista de entrega