Reporte de entrega
Aria Reserve NT Entregas · Unidad 4303
Aria Reserve North Tower · Departamento · Pendiente
Estado
Qué va en esta unidad
Raymundo Fernandez · N-D03 | B3
Piso interior
- Flooring material Developer Standard
- Primary Shower Floor Developer Standard
- Primary Shower Side Wall Developer Standard
- Primary Shower Feature Wall Developer Standard
- Secondary Shower Walls Developer Standard
- Includes: Soundproofing, selected flooring, setting materials,installation, grouting, baseboards and flooring protection.
Piso balcón
- Flooring material: Entire balcony Developer Standard
Cortinas
- Living & Dining room Motorized rollershade (5% openness) w/fascia valance Soft Gray
- Primary bedroom Motorized blackout rollershades w/fascia valance & side channels Soft Gray
- Primary bedroom Motorized rollershade (5% openness) w/fascia valance Soft Gray
- Bedroom 2 Manual blackout rollershades w/fascia valance & side channels Soft Gray
- Bedroom 2 Manual rollershade (5% openness) w/fascia valance Soft Gray
Closets
- Primary bedroom (WIC) Luxe (Led Included) Lino Topo & Bronze glass
- All Guest Bedrooms Premium (Led included) Lino Topo & Bronze glass
Pintura
- Painting 2 coats for walls, ceilings, doors and base boards: 2 BED + OFFICE Zurich White
- shower floor and side wall to match.
Baños
- Shower glass enclosures All secondary bathrooms Glass doors with hinges and handles
- Bathroom accessories Primary, Powder & Guest bathrooms Brizo collection & Standard accessories
- Mirrors Primary Bathroom With LED lights
- Mirrors All Secondary bathrooms With LED lights
Fotos
0Todavía no hay fotos. Toma o sube las del recorrido de esta unidad.
Lista de entrega