Departamento · Piso 42

4201

Trabajo eléctrico especial pendiente · Áreas: Foyer, Living, Dining, Den, Primary bath

J-boxes para sconces en foyer; J-boxes y refuerzo de 3 arañas en living; refuerzo de araña en dining; reubicar switches en living y den; reubicar/agregar J-boxes en primary bath.

#1 · vie 16 oct

Walkthrough 9:00 AM · Cierre 10:30 AM

Zurich White · eléctrico foyer, living, den y primary bath

0 fotos · 4 bien · 3 observaciones

Estado

Qué va en esta unidad

Camilla & Joseph Jani · 4 BED + OFFICE · N-D01 | D1.2

Pintura

  • Zurich White

Piso interior

  • Flooring material Developer Standard
  • All interior areas including elevator lobby (if private), primary bedroom shower floor and side wall to match.
  • Includes: Soundproofing, selected flooring, setting materials, installation, grouting, baseboards and flooring protection.

Piso balcón

  • Flooring material: Entire balcony Developer Standard

Dropped ceiling, soffits y luces

  • Primary - Bedroom Dropped Ceiling (Including LED strip and recessed lights) 4 Apure Minus Two (1 inch fixture)
  • Primary - Bathroom & Closet Bathroom suite with Closet 8 · 3 inch Trimless version
  • All- Guest Bedrooms Soffit (Including LED strip and recessed lights) 11 · 3 inch Trimless version
  • All - Guest Bathrooms Replace / add recessed lights 9 · 3 inch Trimless version
  • Den New or existing (Dropped ceiling / Soffit) replace/add recessed lights 3 · 3 inch Trimless version
  • Living & Dining Dropped Ceiling (Including LED strip and recessed lights) 11 · Apure Minus Two (1 inch fixture)
  • Kitchen Replace / add recessed lights 8 · Apure Minus Two (1 inch fixture)
  • Others Missing areas - Replace / add recessed lights 14 · 3 inch Trimless version

Eléctrico extra (SOW)

  • FOYER — New J-boxes for wall sconces as per plan received
  • LIVING — New J-boxes in dropped ceiling above coffee table as per client drawings
  • LIVING — Relocate existing switches to location per client drawings
  • LIVING — Ceiling reinforcement for three chandeliers per client lighting specs
  • DINING — Ceiling reinforcement for one chandelier per client lighting specs
  • PRIMARY BATH — Relocate two wall J-boxes and add two additional J-boxes as per client drawings
  • DEN — Relocate existing switches to location per client drawings
  • Additional scope of work added 08-27-26. Estimate PC010 (HC001 + 003 Additional).

Cocina

  • Countertops & walls Replace island with waterfall & back countertop / Full backsplash & knee wall Pietra Marmorio

Baños

  • Shower glass enclosures All secondary bathrooms Glass doors with hinges and handles

Puertas Frameless

Sin upgrade (developer).